DESIGN. Q-SENSE MOTION SENSOR WITH 3-PIN BASE is an energy-efficient smart lighting control solution designed for high-bay applications. It activates fixtures instantly upon motion detection and transitions to standby or off when no activity is present. High-precision detection technology ensures reliable performance at mounting heights up to 40 ft.
SMART CONTROL. The Q-SENSE app provides on-site configuration of sensor settings and lighting behavior. Fixtures can be grouped, linked, and assigned operating modes using predefined templates or local adjustments. Scheduling supports both one-time and recurring on/off and dimming actions. Configuration profiles can be shared across users and devices with configurable access permissions. Integrated energy-consumption monitoring provides visibility into system performance.
SAFETY. The Q-SENSE application is capable of operating fully offline, without requiring internet access. Local-only functionality minimizes security risks, enhances protection against unauthorized access, and ensures reliable operation even in restricted-network environments.
VARIETY. This series includes both infrared (IR) and microwave (MW) sensors, catering to diverse needs. Infrared models are ideal for close-range precision, while microwave options provide extended range and sensitivity.
EMERGENCY BACK-UP. The sensor is compatible with ASD emergency backup systems and automatically switches to emergency operation during power loss. When normal AC power is restored, the sensor returns to its programmed operating mode.
APPLICATION: Sensor with a 3-pin base is an ideal quick-installation solution for most indoor and outdoor commercial lighting fixtures such as linear high bay lights, UFO high bay lights, area and canopy lights. IP65 housing ensures operation in wet locations.